Design, Operations & Technology
Latest
Top
Discussions
Testing, Commissioning, and Certification: Uptime, Tier, and ISO Explained
Equipment Checks, System Testing, Integrated Testing Under Load, Tenant Sign-Off, Uptime Tier and ISO, Revenue Timing
Oct 10
25
2
5
Construction Sequencing, QA/QC, and the Discipline That Keeps Schedules Honest
Civil and Site Work, Shell and Structure, MEP and Equipment Lead Times, QA/QC at Installation, Compounding Delays, Predictable Delivery
Oct 3
31
2
Why Space Data Centers Hit Heat Before Cost (The 15-Minute Clue)
Google's Project Suncatcher puts its first AI chips in orbit this week on a SpaceX rideshare, built with Planet. Inside the radiator math and what its…
Sep 28
30
1
4
Klover's President On Building Data Center Enclosures Off-Site
Goldman Sachs expects half of scheduled data center capacity to miss its date. Kristian Fields of Klover explains why Northern Virginia enclosures now…
Sep 23
30
1
3
Order Transformers Before You Buy Land
The equipment queue runs longer than the permitting queue, so capital commits before certainty exists. Inside slot reservations, content rules, interest…
Sep 10
28
3
What a Data Center Actually Costs: CapEx Breakdown and the Drivers That Move It
Power and cooling capex shares, redundancy tier multipliers, air versus liquid economics, geographic cost spread, equipment lead times, cost per…
Sep 5
8
2
Procurement Strategy: Equipment, EPC, and the Contracts That Set Your Timeline
Long-lead equipment, vendor concentration, EPC versus design-build, fixed-price and GMP risk allocation, liquidated damages
Aug 29
2
1
Pre-Leased Is Not Absorbed: What the Silicon Queue Costs
A finished data center earns nothing until the tenant's chips arrive, on a date no developer controls. Inside the allocation queue, firm rent…
Aug 20
28
2
3
Capacity Planning: IT Load, Redundancy, and Scale You Do Not Need Yet
IT load and facility load, rack density ranges, redundancy topology versus Uptime Tier, phased modular buildout, transformer and switchgear lead times
Aug 15
29
2
What Is a Data Center (And Why the AI Boom Runs on Them)
Every search, stream, and AI answer runs through a building you have never noticed. Here is what is inside one, and why the AI boom turned it into the…
Jul 17
29
1
Design Is Where the Money Is Locked, Not Spent
Conceptual versus detailed design, Tier and redundancy economics, long-lead procurement timing, PUE and reliability class, the design-to-procurement…
Jul 4
22
3
Open Compute Project: The Hardware Moat Facebook Built and Gave Away
OCP's Strategic Logic, Enterprise Hardware Commoditization, The Design Efficiency Gap, What Hyperscale Moats Actually Look Like
Apr 22
28
1