Discussion about this post

User's avatar
Neil Winward's avatar

Troubling to see the near-term obsolescence. If the facility was specified for 8–12 kW racks and the substation feeding it was specified for the same load, doesn't the retrofit math break upstream of the building — making the real bifurcation territorial rather than operator-level?

No posts

Ready for more?