Data Center Power Infrastructure: The Foundation of AI Computing Performance
Energy

Data Center Power Infrastructure: The Foundation of AI Computing Performance

This article is the first in a two-part series examining critical data center infrastructure. Part 2 will focus on cooling infrastructure.

Obinna Isiadinso's avatar
Obinna Isiadinso
Apr 11, 2025
∙ Paid
7

Share this post

Global Data Center Hub
Global Data Center Hub
Data Center Power Infrastructure: The Foundation of AI Computing Performance
1
Share

You received this email because you subscribed to Global Data Center Hub, a newsletter about the global data center sector.

Thank you very much for supporting my newsletter this month. Your readership encourages me to provide these insights, and I’m truly grateful for it.

We publish new insights seven days a week, helping you stay ahead of the most important shifts in data centers, AI infrastructure, and global connectivity.

Our premium insights are reserved for paid subscribers.

If you haven’t upgraded yet, now’s a great time:
👉 Subscribe and join hundreds of readers of “Global Data Center Hub” with a 20% discount on the annual plan: Subscribe here


What You'll Learn

  • How AI is fundamentally transforming power requirements for data centers globally

  • Why power availability has become the primary constraint for digital infrastructure expansion

  • How power challenges manifest differently across developed and emerging markets

  • Which power technologies are best suited for diverse geographical contexts

  • What strategic considerations should guide power infrastructure investment decisions

  • How to prepare for NVIDIA's planned 600kW racks by 2027

Introduction

Jensen Huang's recent GTC 2025 keynote presented a significant roadmap for the data center industry.

His announcement that NVIDIA's Vera Rubin Ultra architecture will require racks supporting an extraordinary 600kW of power by 2027 signals a substantial evolution that requires forward planning.

This coming power threshold represents a fundamental shift that will make power infrastructure the critical constraint for next-generation AI computing.

The power requirements for data centers are evolving significantly. While traditional facilities operated comfortably at 5-10MW, the new generation of AI-optimized centers requires 100-200MW and beyond.

This progressive shift is transforming power infrastructure from a background utility to a critical strategic consideration.

The operators who prepare now to secure and efficiently manage increased power resources will likely establish competitive advantages in the digital economy of tomorrow.

This challenge manifests differently across global markets.

Established regions like Northern Virginia and Silicon Valley currently face capacity constraints and transmission bottlenecks, while emerging economies in Africa, South America, and parts of Asia contend with fundamental reliability issues, with some regions experiencing thousands of minutes of outages annually.

This article examines how power infrastructure is evolving globally to meet these increasing demands, the diverse challenges across regions, and the strategic considerations that will determine which facilities will be prepared to host the next generation of AI computing by 2027.

This article is the first in a two-part series examining critical data center infrastructure. Part 2 focuses on cooling infrastructure.

The Universal Economics of Power Constraints

The economics of power have fundamentally changed in the AI era. NVIDIA's GPU roadmap tells the story: each generation requires significantly more power while delivering exponentially greater performance.

The current Blackwell architecture will soon give way to Blackwell Ultra with expanded memory capabilities, followed by Vera Rubin in 2026, and ultimately Vera Rubin Ultra in 2027—each requiring substantially more power than its predecessor.

These accelerators consume 4-8 times more power than traditional CPU-based systems while delivering the computational density necessary for advanced AI workloads. This exponential increase creates cascading challenges for data center operators and infrastructure investors worldwide.

Power availability has emerged as the primary constraint on digital infrastructure expansion. Tech giants now select data center locations based first on power capacity, then on fiber connectivity, water availability, and other traditional factors.

The resulting "power rush" has created bottlenecks in regional grids, with major utilities in Northern Virginia, Oregon, and other key markets unable to meet surging demand.

In established markets, these constraints create hidden costs beyond obvious capital expenditures. Projects face multi-year delays as operators wait for utility companies to upgrade transmission infrastructure.

Microsoft has experienced significant delays in AI expansion plans in key markets, forcing the company to develop facilities in energy-rich locations far from traditional data center hubs.

Meanwhile, in emerging markets, the fundamental challenge is often basic reliability. Nigeria's power grid experiences SAIDI (System Average Interruption Duration Index) exceeding 4,600 minutes annually (over 76 hours of outages) compared to just 2-3 minutes in leading developed economies.

This reality forces data center operators in these regions to implement robust backup systems and alternative power strategies, often at significant cost.

For operators globally, the TCO calculation must now factor in:

  • Power acquisition costs (often with substantial premiums in constrained markets)

  • Transmission upgrades and interconnection expenses

  • Redundancy systems capable of supporting higher critical loads

  • Efficiency technologies to maximize computational output per kilowatt

  • Regional reliability factors and mitigation strategies

The economics typically favor new construction optimized for high-density AI workloads in regions with abundant, reliable power.

The Power Infrastructure Spectrum

Power infrastructure for modern data centers encompasses multiple integrated systems that transform grid electricity into reliable, high-quality power for sensitive computing equipment.

Grid Connectivity

The foundation begins with utility connections, typically configured as redundant medium-voltage (13.8kV-34.5kV) feeds. These connections determine maximum capacity and represent the first potential bottleneck.

Larger AI facilities often require dedicated substations and direct high-voltage transmission interconnections that can take 24-36 months to complete.

Power Distribution Architectures

Internal distribution follows redundancy models that balance reliability against cost:

  • N+1 redundancy: Provides one backup component beyond minimum requirements

  • 2N redundancy: Complete duplication of critical systems

  • 2N+1 redundancy: Dual systems with additional backup components

Most hyperscale facilities implement 2N architectures for mission-critical AI infrastructure, using isolated power paths (A-side/B-side) to eliminate single points of failure.

Uninterruptible Power Supply (UPS) Systems

UPS systems provide immediate backup power during grid instability. The technology landscape is evolving rapidly:

  • Lead-acid batteries: Traditional option with proven reliability but lower energy density

  • Lithium-ion batteries: Offering 2-3x energy density, faster recharge, and longer lifespan

  • Flywheel systems: Mechanical energy storage for short-duration backup

  • Ultracapacitors: Rapid discharge capabilities for power quality management

The shift toward lithium-ion technology is accelerating, with approximately 68% of new data center UPS installations now choosing this option despite higher upfront costs. The technology provides a ~15% smaller footprint and extends replacement cycles from 5-7 years to 10-12 years.

Backup Generation

For extended outages, backup generation systems remain essential:

  • Diesel generators: Traditional solution with reliable performance but environmental concerns

  • Natural gas generators: Lower emissions but dependent on pipeline infrastructure

  • Hydrogen fuel cells: Zero-emission alternative still scaling for data center applications

Most facilities maintain 24-72 hours of on-site fuel reserves, with larger AI facilities implementing substantial generator farms capable of supporting full-facility loads independently from the grid.

Next-Generation AI Hardware Requirements

NVIDIA's roadmap illustrates the rapidly increasing power demands that infrastructure must accommodate.

The current Blackwell architecture will soon be followed by Blackwell Ultra with 288GB of memory, then Vera Rubin in 2026 combining custom CPU and GPU components, and ultimately Vera Rubin Ultra in 2027, which integrates four GPUs into a single package requiring unprecedented power density.

Each Rubin Ultra package is expected to deliver approximately 100 petaFLOPS of performance, but will require power and cooling infrastructure capable of handling 600kW racks—a challenge that few existing facilities can meet.

Share

Regional Power Challenges and Solutions

The challenges and solutions for power infrastructure vary significantly across global regions, requiring tailored approaches to address local conditions.

Developed Markets (North America, Western Europe)

In mature data center regions like North America and Europe, the primary constraint is securing sufficient power capacity for expansion.

Northern Virginia, the world's largest data center market, faces severe power constraints despite its sophisticated infrastructure. Operators are exploring secondary markets with untapped power capacity, creating opportunities in regions previously overlooked.

Jensen Huang's vision that "every company will have two factories: one for what they build and another for AI" underscores why established markets are experiencing such acute power shortages. As enterprises race to build their "AI factories," they're competing for increasingly scarce power resources in traditional data center hubs.

Tropical Emerging Markets (Southeast Asia, parts of South America, Africa)

Countries across Africa, South America, and parts of Asia face fundamentally different challenges centered on reliability and quality rather than just capacity. These regions have developed innovative approaches to power infrastructure:

Africa: Countries like Kenya, Nigeria, and South Africa implement hybrid power systems that combine diesel generators with renewable sources and battery storage. MTN's Johannesburg data center uses solar mirrors for cooling, while Kenya's M-KOPA Solar provides pay-as-you-go solar leases with IoT billing to support edge computing infrastructure.

South America: Brazil's Amazon region demonstrates how hybrid solar-diesel-battery setups can cut diesel consumption by 70% while improving reliability for remote facilities. These systems bypass traditional grid dependencies, creating sustainable operation in regions with inconsistent power.

Southeast Asia: Countries like Vietnam (with 25% solar share) and Indonesia are developing purpose-built renewable infrastructure alongside traditional systems. Evolution Data Centres focuses on 100% renewable-powered hyperscale facilities in Vietnam and Indonesia, incorporating AI workload optimization and heat reuse systems.

Arid Emerging Markets (Middle East, parts of Africa)

Countries like Saudi Arabia and the UAE are leveraging abundant energy resources to position themselves as AI infrastructure hubs.

These regions are particularly well-suited to handle the massive power requirements of NVIDIA's future architectures, with existing infrastructure and energy availability that can accommodate rapid scaling. Investments in hydrogen fuel cells and innovative power distribution techniques capitalize on local advantages while advancing sustainability goals.

Case Studies: Power Success Stories Across Markets

Innovative power approaches are being implemented across diverse geographical contexts, providing valuable insights into effective strategies for different environments.

Google's 24/7 Carbon-Free Energy Program

Google has pioneered the shift from voluntary green initiatives to business-critical renewable energy strategies.

Their 24/7 Carbon-Free Energy program exemplifies this transition, matching energy consumption with carbon-free sources in real-time rather than through annual offsets. This approach ensures that AI workloads run on clean energy regardless of when they're executed, addressing the fundamental intermittency challenge of renewable resources.

Microsoft's San Jose Microgrid

Microsoft implemented a 20MW microgrid at its San Jose data center using renewable natural gas, demonstrating how these systems can integrate renewables while maintaining reliability for critical operations.

The microgrid combines on-site generation, storage, and intelligent control systems to create an independent power ecosystem that provides resilience against grid instability while optimizing energy costs.

MTN's Johannesburg Solar Integration

MTN installed innovative solar solutions at their Johannesburg headquarters, using renewable energy to support data center operations in a region facing persistent energy reliability challenges.

This approach reduces reliance on traditional power sources while enhancing sustainability and operational resilience in an emerging market context.

Gujarat's Solar Power Attraction

Gujarat's impressive 30 GW solar capacity has driven tariffs down to $0.03/kWh, attracting $1.8B in hyperscale investment from companies seeking both affordable and reliable power. This success story demonstrates how renewable resources can create competitive advantage for regions previously overlooked in data center development.

M-KOPA Solar in Kenya

Kenya's M-KOPA provides pay-as-you-go solar leases with IoT billing to support distributed infrastructure in regions with limited grid reliability.

With over 1 million households electrified, this model demonstrates innovative approaches to power infrastructure in emerging markets where traditional grid development lags behind digital infrastructure needs.

Seven Key Trends Reshaping Power Infrastructure

Several significant trends are transforming how data centers approach power management worldwide, with implications for both near-term operations and long-term strategic planning.

Keep reading with a 7-day free trial

Subscribe to Global Data Center Hub to keep reading this post and get 7 days of free access to the full post archives.

Already a paid subscriber? Sign in
© 2025 Obinna Isiadinso
Privacy ∙ Terms ∙ Collection notice
Start writingGet the app
Substack is the home for great culture

Share